Oke, S. and Owaba, O. C. (2007) “A Fuzzy Linguistic Approach of Preventive Maintenance Scheduling Cost Optimisation”, Kathmandu University Journal of Science Engineering and Technology, 3(1). doi: 10.70530/kuset.v3i1.207.